Location: Amsterdam, the Netherlands
Construction of a new tunnel with a length of 1,283 m (5 lanes).
Completion date 2014
Ordering Party: Croonwolter&dros for Rijkswaterstaat
Scope of works:
- Preparation of documentation for low-voltage installations in the tunnel and design of low-voltage distribution cabinets.